Bathroom & Kitchen Renovations · Essex
Bathrooms & Kitchens
Stripped Back,
Rebuilt Properly.
Full bathroom and kitchen renovations across Essex — strip-out, replumb, rewire, tank, tile, plaster, fit and sign-off run by one accountable team. Fixed written quote, manufacturer guarantees on fitted kit, work we stand behind on completion.
35+ Years On The Tools · Fixed Written Quotes · Same-Week Surveys
Service Overview
Bathroom & Kitchen Renovations —
The Brief, In Plain English.
What It Is
A bathroom or kitchen renovation strips a tired room back to brick and rebuilds it as a modern, properly-serviced space. That can mean a straight like-for-like refit or a full reconfiguration — moving walls, relocating soils, replacing the consumer-unit feed, retiling the whole room and fitting new sanitaryware or units.
Who It's For
Essex homeowners with tired 1990s or early-2000s suites and units, owners moving into a property who want the kitchen and bathrooms done before they unpack, landlords turning around BTL stock between tenancies, and homeowners coordinating bathroom and kitchen work alongside a wider extension or refurbishment programme.
When You Need It
Year-round. Bathrooms typically run 1–3 weeks depending on whether it's a like-for-like refit or a full wet-room reconfigure. Kitchens typically run 2–4 weeks. Coordinated with extension or refurbishment programmes so the messy phases overlap once rather than dragging on.
Why It Matters
Bathrooms and kitchens go wrong when the trades aren't coordinated. The tiler arrives before the plumber has fitted the second-fix valves, the kitchen fitter walks into a room that isn't square or fully serviced, the electrician comes back twice because the original first fix missed a circuit. One accountable team running plumbing, electrics, tiling, plastering and fitting in the correct order avoids almost every common failure.
What Happens If You Wait
The Cost Of
Doing Nothing.
Bathroom and kitchen failures are almost always at the joints between trades — the bits that fall between plumber, electrician and tiler.
Risks Of Ignoring It
- →Wet-area floor not tanked before tile — water tracks through grout into the substrate, rot inside 18 months.
- →Shower tray bedded on uneven floor — flexes under use, silicone joint fails, leak through the ceiling.
- →Kitchen fitted before electrical certificate signed off — appliances on the wrong circuits, units pulled out to refix sockets.
- →Worktop template taken before units are square — gap at the wall the installer can't close.
- →Ventilation skipped — moisture-laden air with nowhere to go, mould on grout inside 12 months.
Common Mistakes Customers Make
- ×Cheap silicone bead and grout — the cost is hidden until you live with the consequences.
- ×Choosing units and tiles before the room layout is locked in.
- ×Splitting the work between separate trades with no main contractor coordinating order.
- ×Skipping a written contract with stage payments — verbal extras become invoice arguments.
Our Process
First Call To
Final Sign-Off.
01
Survey & Spec
Measure up, review existing plumbing and electrical supply, agree layout, fittings and finishes.
02
Fixed Quote & Programme
Itemised written quote covering strip-out, services, tiling, fitting and decoration, plus a dated programme so you know when each trade is on site.
03
Strip & First Fix
Strip-out and skip the old room, replumb hot/cold/waste, rewire to current standards, install ventilation, tank wet areas where required.
04
Plaster, Tile & Fit
Plaster or board the walls, tile the wet areas, install units or sanitaryware, fit worktops, sinks, taps and shower kit.
05
Sign-Off & Handover
Electrical certification, snag list walked together, manufacturer paperwork bundled and handed over with the keys.
Why It's Worth It
What You
Actually Get.
One Crew Per Room
Plumbing, electrics, tile, plaster and fit all coordinated by one team — no trades waiting on each other.
Tanked Wet Areas
Wet rooms and shower zones properly tanked before tile, with falls set to the drain. The detail that decides whether the install lasts.
Certified Electrical Work
Notifiable electrical works are carried out by a registered electrician we work alongside, with any required certification handled as part of the job.
Manufacturer Guarantees
Installed kits (boilers, kitchens, sanitaryware, appliances) are covered by their manufacturer guarantees, with paperwork bundled at handover.
Tidy Site, Daily
Dust sheets down, off-cuts skipped daily, floors and routes through the house protected.
Fixed Price In Writing
Variations re-quoted in writing before we proceed — no verbal extras at handover.
In Detail
Bathroom & Kitchen Renovations —
Every Variation Covered.
Materials, methods and the situations each variation applies to — so you know what you're buying before you buy it.
Working across
Grays · Thurrock · Basildon · Billericay · Rochford · Romford · Upminster
Full Service Area MapFull Bathroom Refits
Strip-out, replumb, rewire, tank, plaster, tile, fit and decorate. Like-for-like or fully reconfigured layouts. Includes ventilation upgrade where the existing extract is undersized.
Wet Rooms & En-Suites
Properly tanked wet-area floors with falls set to a linear or centre drain, full-height tile, frameless glazing, low-profile valves and underfloor heating where the substrate allows.
Full Kitchen Refits
Strip-out, replumb, rewire to current circuit standards, install units, worktops, splashback, sink, taps, integrated appliances and ventilation. Coordinated so the worktop template lands on square, plumb, fully-serviced units.
Kitchen-Diner Reconfigurations
Where the kitchen refit triggers wall removal, structural beam or layout change — usually coordinated alongside an extension or refurbishment programme so the trades overlap once rather than dragging out.
Recent Projects
Bathroom & Kitchen Renovations —
Recent Builds.



Questions
Straight
Answers.
Cost, timeline, lifespan, lead times — the questions everyone asks, answered before you call.
Ask YoursHow much does a bathroom or kitchen renovation cost?
+
Cost scales with size, layout, fittings and whether it's a like-for-like refit or full reconfigure. We give fixed written quotes after a site visit, itemised by strip-out, services, finishes and fittings so you can adjust scope before committing.
How long does a bathroom or kitchen take?
+
A like-for-like bathroom refit is usually 1–2 weeks. A full wet-room reconfigure runs 2–3 weeks. A kitchen refit typically runs 2–4 weeks depending on layout and finish.
Do you handle the electrics?
+
Yes. Notifiable electrical works are carried out by a registered electrician we work alongside, with any required certification handled as part of the job and paperwork bundled at handover.
Do you handle the plumbing?
+
Yes — full hot/cold/waste replumb, pressurised systems, combi or system boiler upgrades coordinated with a registered gas engineer where needed.
Can we live in the house while you work?
+
Yes — we hoarding off the works area, protect floors and routes, and keep at least one bathroom or kitchen available throughout for most refits.
Do you supply the kitchen or bathroom units?
+
Either — we can supply through our trade contacts or fit units and sanitaryware you've bought yourself. Either route, we coordinate the worktop template, splashback tile and final sign-off.
Do you stand behind your work?
+
Yes — if something we installed isn't right, we come back and put it right. Manufacturer guarantees apply to installed kits (boilers, kitchens, sanitaryware, appliances).
Do you cover my postcode?
+
Yes — Grays, Thurrock, Basildon, Billericay, Rochford, Romford, Upminster, Hornchurch and across Essex.
Next Step
Need A Bathroom Or Kitchen Done Properly?
Free site survey, fixed written quote inside 48 hours, no obligation. 35+ years on the tools, Grays-based.
Related Services

